Neraca Energy Graph
Realisasi Energi
PT PLN (PERSERO) P3B JAWA BALI
Minggu, 1 Maret 2015«»
 
ENERGI TERIMA
Bulan Maret 2015
13.963 GWh
Akumulasi
39.775 GWh
 
 
 
 
ENERGI KIRIM
Bulan Maret 2015
TM
12.560 GWh
TT
1.006 GWh
TOTAL
13.567 GWh
 
 
 
Akumulasi s/d Maret 2015
TM
35.799 GWh
TT
2.852 GWh
TOTAL
38.651 GWh
 
PEAK KOINS
:31/03/2015 Pkl: 19:00
Realisasi Energi Region

APB DKI JAKARTA DAN BANTEN

APB JAWA BARAT

APB JAWA TENGAH DAN DIY

APB JAWA TIMUR

APB BALI
Distribusi Energi Jawa Bali
Koinsiden Distribusi Peak Jawa Bali
 
Konsumen Tegangan Tinggi
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Energi Terima: 13.601.649.645 kWh Energi Terima: 12.210.129.788 kWh Energi Terima: 13.962.951.204 kWh Energi Kirim: WBP: 2.438.396.420 kWh LWBP1: 4.034.740.198 kWh LWBP2: 6.731.643.701 kWh Total: 13.204.780.319 kWh Energi Kirim: WBP: 2.438.396.420 kWh LWBP1: 4.034.740.198 kWh LWBP2: 6.731.643.701 kWh Total: 13.204.780.319 kWh Energi Kirim: WBP: 2.438.396.420 kWh LWBP1: 4.034.740.198 kWh LWBP2: 6.731.643.701 kWh Total: 13.204.780.319 kWh Energi Kirim: WBP: 2.193.970.695 kWh LWBP1: 3.617.879.520 kWh LWBP2: 6.068.092.730 kWh Total: 11.879.942.945 kWh Energi Kirim: WBP: 2.193.970.695 kWh LWBP1: 3.617.879.520 kWh LWBP2: 6.068.092.730 kWh Total: 11.879.942.945 kWh Energi Kirim: WBP: 2.193.970.695 kWh LWBP1: 3.617.879.520 kWh LWBP2: 6.068.092.730 kWh Total: 11.879.942.945 kWh Energi Kirim: WBP: 2.489.710.837 kWh LWBP1: 4.128.385.131 kWh LWBP2: 6.948.533.565 kWh Total: 13.566.629.533 kWh Energi Kirim: WBP: 2.489.710.837 kWh LWBP1: 4.128.385.131 kWh LWBP2: 6.948.533.565 kWh Total: 13.566.629.533 kWh Energi Kirim: WBP: 2.489.710.837 kWh LWBP1: 4.128.385.131 kWh LWBP2: 6.948.533.565 kWh Total: 13.566.629.533 kWh